Big renovations need bigger services
Leaside and Bennington Heights were mostly built in the 1930s and 1940s, and Davisville, Chaplin Estates and Moore Park are older still. A lot of those houses have since been underpinned, extended at the back, given a second storey or rebuilt from the foundation up. The electrical service often hasn’t kept pace. A 100 amp panel that was fine for the original house now has to carry central air, a larger kitchen, heated floors, a finished basement and, more and more often, a heat pump and an EV charger.
If you are planning any of that, the service is worth sorting out early, before the walls close in and while it is still easy to run new home runs back to the panel.
Panel swap or 200 amp service?
Not every house needs 200 amps. A load calculation, based on the floor area and every major appliance you have or plan to add, tells us what the service has to carry. From there it is one of two jobs:
- Panel replacement: a new panel with modern breakers and room to grow, on the existing service. Usually done in a day.
- Service upgrade: new service entrance equipment and meter base at 200 amps, with the disconnect and reconnect booked through Toronto Hydro.
Either way, the work is done under an Electrical Safety Authority (ESA) permit and inspected before it is closed up.
Done neatly, labelled properly
A panel is something you will open again, usually in the dark when a breaker trips. We dress the wiring cleanly, add arc-fault and ground-fault protection where the code calls for it, and leave a typed directory that names every circuit by room. If your house has an old fuse sub-panel, a separate garage feed or circuits that were added by previous owners, we sort those out at the same time so everything runs through one tidy, properly sized panel.
Our panel upgrade process
- Photo first. Text a photo of your panel and meter, and tell us what you are planning for the house.
- Load calculation. We look at the service, the panel and your plans, and recommend the right size, including when a smaller upgrade will do.
- Permit and booking. We explain the ESA permit and, for a service upgrade, schedule around the Toronto Hydro disconnect.
- Install and inspect. New equipment in, circuits tested and labelled, and the work inspected.