Panel upgrades for Leaside and Midtown homes

Old fuse boxes, 100 amp panels with every slot full, and services that can’t keep up with a second-storey addition or a heat pump. We size the new panel to the house you’re building, not the one that was there in 1945.

Big renovations need bigger services

Leaside and Bennington Heights were mostly built in the 1930s and 1940s, and Davisville, Chaplin Estates and Moore Park are older still. A lot of those houses have since been underpinned, extended at the back, given a second storey or rebuilt from the foundation up. The electrical service often hasn’t kept pace. A 100 amp panel that was fine for the original house now has to carry central air, a larger kitchen, heated floors, a finished basement and, more and more often, a heat pump and an EV charger.

If you are planning any of that, the service is worth sorting out early, before the walls close in and while it is still easy to run new home runs back to the panel.

Panel swap or 200 amp service?

Not every house needs 200 amps. A load calculation, based on the floor area and every major appliance you have or plan to add, tells us what the service has to carry. From there it is one of two jobs:

  • Panel replacement: a new panel with modern breakers and room to grow, on the existing service. Usually done in a day.
  • Service upgrade: new service entrance equipment and meter base at 200 amps, with the disconnect and reconnect booked through Toronto Hydro.

Either way, the work is done under an Electrical Safety Authority (ESA) permit and inspected before it is closed up.

Done neatly, labelled properly

A panel is something you will open again, usually in the dark when a breaker trips. We dress the wiring cleanly, add arc-fault and ground-fault protection where the code calls for it, and leave a typed directory that names every circuit by room. If your house has an old fuse sub-panel, a separate garage feed or circuits that were added by previous owners, we sort those out at the same time so everything runs through one tidy, properly sized panel.

Our panel upgrade process

  1. Photo first. Text a photo of your panel and meter, and tell us what you are planning for the house.
  2. Load calculation. We look at the service, the panel and your plans, and recommend the right size, including when a smaller upgrade will do.
  3. Permit and booking. We explain the ESA permit and, for a service upgrade, schedule around the Toronto Hydro disconnect.
  4. Install and inspect. New equipment in, circuits tested and labelled, and the work inspected.

Panel upgrade questions

I am adding a second storey. When should I deal with the panel?

Early. Ideally the new service is sized during design, and the panel is installed before the new wiring is roughed in, so the new circuits can go straight into it.

Can a 200 amp service handle a heat pump and an EV?

In most Leaside and Midtown houses, yes, but it depends on what else is electric. The load calculation will show how much headroom you will have.

How long is the power off?

Part of a day for a panel replacement. For a service upgrade, the outage is tied to the Toronto Hydro appointment, which we plan ahead of time.

Do you replace old fuse panels?

Yes. Fuse panels and early breaker panels are common in older Midtown houses, and many insurers want them replaced.

Is my old panel a safety concern?

Some older panels and breakers have known reliability problems, and any panel with heat marks, rust or loose connections needs attention. If you are not sure what you have, text us a photo of the label inside the door and we will tell you.