Start with the panel
Every charger install starts with a look at the panel and a load calculation. A Level 2 charger typically needs a 40 to 60 amp circuit, and many Midtown houses are already carrying air conditioning, a big kitchen and a finished basement on a 100 or 125 amp service. Depending on what the numbers show, we either add a dedicated circuit, install an EV energy management system that slows or pauses charging when the house is busy, or plan the charger alongside a panel upgrade. We also look at where the panel sits relative to the parking spot, since the length and route of the run affect both the wire size and the work involved.
Two EVs, one panel
More and more households in Leaside and Moore Park have two electric cars, or one EV and a plug-in hybrid. Two full-power circuits are often more than the service can spare. Instead, chargers that support power sharing, like the Tesla Wall Connector, can split a single circuit between two cars and balance the current automatically, so both are charged overnight without upgrading the service. Load management devices can do a similar job for other brands. We look at your driving, your panel and your parking, and set it up so it simply works every night.
Garages, driveways and mutual drives
Leaside houses often have a detached garage at the end of a long driveway, while Davisville and Chaplin Estates have plenty of mutual drives and tight side yards. North Rosedale and Moore Park homes are more likely to have attached garages. Each changes the job:
- Attached garage: usually a direct run from the panel.
- Detached garage: a feed from the house, overhead or in buried conduit, sometimes with a small sub-panel.
- Driveway: an outdoor-rated charger mounted on the house, placed so the cable reaches without crossing a path.
We install Tesla, ChargePoint, Grizzl-E, FLO and other major brands, hardwired for daily use, under an ESA permit and inspection.
How an EV charger install works
- Send photos. Your panel, where you park, and the car and charger you have or are considering.
- Capacity check. A load calculation decides between a direct circuit, power sharing, load management or an upgrade.
- Installation. Breaker, wiring and charger mounted and connected, usually in a single visit for an attached garage or driveway.
- Setup and test. We configure the charger’s current to match the circuit and test it with your car where possible.