Which houses still have it
Knob-and-tube was used in Toronto houses until roughly the 1940s, so it turns up most in the older parts of Midtown: Moore Park and North Rosedale, Davisville Village and Chaplin Estates, and the earliest houses in Leaside. In many homes it has been partly replaced over the years, which can make it hard to tell how much is still live. Additions built over the decades mean it is common to find modern wiring in one part of the house and original circuits in another. Houses from the 1940s and 1950s can have their own issues, such as early ungrounded cable and armoured cable that has lost its insulation at the connections.
Why it matters
Knob-and-tube has no ground, its rubber and cloth insulation becomes brittle with age, and many runs have been extended or spliced by past owners. It was designed to cool in open air, so where it has been covered by blown-in insulation in an attic or wall it can overheat. Most insurers now ask about it directly, and many will not insure a house with active knob-and-tube unless there is a plan to replace it.
How we replace it
We start with an inspection, tracing circuits from the panel and checking the attic, the basement and a sample of outlets and fixtures, so you know exactly what is left and where. From there we plan the rewire room by room. New cable is fished through existing walls and ceilings wherever possible, with small, planned openings only where a run cannot be fished. Plaster walls and original trim in older Midtown houses are treated with care.
Each new circuit is grounded, and kitchens, bathrooms and exterior outlets get the protection the current code requires. Old runs are disconnected at the panel as they are replaced. Rewiring is often a good time to replace an old panel too. All of the work is done under an ESA permit and inspection, which gives you the documentation your insurer will ask for.
How a rewire works
- Inspection. We trace and document the existing wiring and identify what is still knob-and-tube.
- Plan. A room-by-room scope with openings marked and any panel work noted.
- Phased rewiring. New grounded circuits installed and old ones disconnected, with power restored to finished areas each day.
- Inspection and paperwork. ESA inspection and documentation for your insurer.